Comprehensive auditing (technical, administrative, financial, accounting, environmental, security and non-work health) expands the silver Form, taxi track and maintenance of the handling and security areas of the La Florida airport, in the city of Tumaco.
A diagnosis of the current state of the airport infrastructure has been carried out: platform Form Form, taxi lanes, complementary infrastructure, infrastructure adjacent to the areas of intervention, runway connection, studies and geotechnical projects, structural-pavement, geometric and hydraulic, and expansion of the platform Form Form and taxi track.
On the land side, maintenance was carried out at the passenger terminal in the control tower.
| Area | Area (m²) |
|---|---|
| Area A | 4851 |
| taxiway | 667 |
| Area D | 1.257 |
| Area C | 3390 |
| ALPHA | 3401 |
| CHARLIE | 3,757 |
| SEI | 1926 |
| Total areas | 19.251 |