Grupo COBA B&C Colombia

3 Districts Irrigation

Detailed Information

District

Gross Area (ha)

Net Area (ha)

Main Works

Barranquillita-Bajirá, municipalities of Mutatá and Turbo, Department of Antioquia28,80012,662Main rivers influencing the project: León and Vilarteaga. Proposed works: Drainage system by canals (152 km) and underground drains and flood control, improvement of the road system (80 km). Oversight of the Feasibility Studies and Designs
Firavitoba, municipalities of Iza, Pesca, Firavitoba and Sogamoso, Department of Boyacá4,2003,563Main rivers influencing the project: Iza and Pesca. Proposed works: 2 earth dams, El Batán (H=40 m) and El Morro (H=23 m), pumping stations, pressurized irrigation system (240 km) with sprinkler and micro-sprinkler irrigation, road system improvements (8 km). Oversight of the Feasibility Studies and Designs
Pamplonita, northwest of the city of Cúcuta, Department of Norte de Santander6,6504,017Main rivers influencing the project: Zulia and Pamplonita. Proposed works: Water intake and conveyance systems (13 km) and canal irrigation (79 km), flood control dikes (12 km), 3 pumping stations, drainage system improvements (18.5 km) and road improvements (155 km). Oversight of the Feasibility Studies and Designs
Datos Generales
Sector Hydraulic Infrastructure
Servicio Supervision of Studies and Designs
Fechas Inicio: 2014-06-01 | Fin: 2015-10-31
Estado Concluído
Localización Antioquia, Boyacá and Northern Santander, Colombia
Cliente Fondo de Adaptación, FA